Nearly three in four general aviation maintenance professionals are dissatisfied with what they pay for parts, according to 2026 survey results published by Airworthy.com operator TBX on November 12, 2026. The survey found 72% of respondents dissatisfied with pricing from their primary suppliers, including 42% who described themselves as extremely dissatisfied. Only 7% reported being satisfied with pricing.

Lead times drew the next highest level of frustration. Fifty-nine percent of respondents said they were dissatisfied with how long parts take to arrive, with 25% extremely dissatisfied. Supplier performance on technical support and shipping speed scored better, with satisfaction outweighing dissatisfaction in both categories.

Expectations for the months ahead were largely negative. Two-thirds of respondents, or 66%, said they expect the parts supply environment to worsen, split between 44% who see it worsening slightly and 22% who see it worsening significantly. Just 15% expect conditions to improve, while 19% expect them to stay the same.

The survey also examined parts manufacturer approval, or PMA, components. According to TBX, 92% of the general aviation industry views PMA parts as matching or exceeding original equipment manufacturer parts on quality. The report noted that the average certified general aviation piston aircraft is now 53 years old.

The findings point to cost and availability as the central pressures on general aviation shops, with respondents describing considerable time spent looking up and sourcing parts across multiple suppliers.

Source: Airworthy.com (TBX) -- https://www.airworthy.com/blog/the-great-parts-squeeze-what-2026-survey-data-reveals