Nearly three quarters of US data center operators, 74%, say insufficient power and grid capacity are moderately or severely limiting expansion, according to a Fluke survey of 500 data center operators and professionals across the United States reported by Data Center Knowledge on November 19, 2026.
The survey points to constraints inside facilities as well as at the utility connection. Only 36% of respondents said their electrical infrastructure is fully prepared for higher density AI workloads, and nearly a third said power quality issues have reduced their ability to deploy or operate high density AI and GPU workloads.
Electrical problems were widespread. About 76% of respondents reported experiencing electrical or power system issues, and 79% said power quality problems had contributed over the past year to delays, service disruptions, unplanned downtime, or serious near misses. Data Center Knowledge notes that the 79% figure groups operational failures with incidents that did not cause an outage, so it does not mean that nearly four in five respondents experienced downtime.
Monitoring gaps also appeared in the results. Some 78% of respondents said they lacked comprehensive, continuous, real time visibility across critical electrical systems, while 15% said electrical problems were identified only after performance degradation, equipment failure, or downtime had occurred.
Workforce pressure is adding to the strain. Recruiting qualified electrical technicians has become harder for 57% of respondents, although 65% said skills shortages had not delayed infrastructure upgrades or new capacity.
Michael Stuart, a senior manager and technical fellow at Fluke, said weaknesses often emerge where power, cooling, and cabling systems intersect, and recommended measuring power quality as close as possible to GPU loads before high density racks are deployed.